Nationally Operating · Canada

Utility Metering Engineered to Precision

From design to commissioning, VMS delivers reliable submetering solutions. We provide the expertise, engineered drawings, commissioning, and documentation needed to ensure electrical, water, and BTU metering systems are installed correctly, communicating properly, and ready for operation.

30+
Active Projects
3
Meter Types
10+
Provinces
System Overview
LIVE
ELECTRICAL FEED — PHASE A
Electrical Usage
12.4kWh
Water Flow
8.3m³
BTU Delta-T
14.2°C
M-Bus Uptime
99.1%
Electrical MetersAll 24 units online
M-Bus Network18/18 responding
BTU Unit 7BPending commissioning
Electrical Metering
M-Bus Water Metering
BTU Metering
Cellular Gateways
Wireless Metering
Cellular Water Metering
Wired Water Metering
Thermal Metering
Multi-Circuit Metering
Electrical Metering
M-Bus Water Metering
BTU Metering
Cellular Gateways
Wireless Metering
Cellular Water Metering
Wired Water Metering
Thermal Metering
Multi-Circuit Metering
What We Do

End-to-End Utility
Metering Services

Every technical layer of your submetering project — from site assessment to commissioning sign-off.

Why VMS

The Gap Between
Installation and Operation

Installing the equipment is only part of the job. VMS bridges the critical gap between installation and a fully operational metering system — specializing in system verification, communication integration, meter configuration, commissioning, and deficiency resolution.

01

Field + Technical Expertise

We combine hands-on field experience with technologist-level system knowledge — understanding how metering, electrical, mechanical, and communication systems work together, not just how the equipment is installed.

02

Premium Documentation Standard

Clear, professional drawings, commissioning reports, deficiency records, and as-built documentation prepared for project teams, consultants, and closeout requirements — not simply field notes.

03

National Reach, Technical Precision

Supporting projects across Canada with the responsiveness, accountability, and technical attention of a specialized metering team.

VMS Commissioning Standard
System Verification Before Handoff
CT readings, flow rates, temperatures, meter configuration, and system operation verified in the field before commissioning is complete
Meter & Data Point Verification
Meter serial numbers, addresses, configurations, and associated data points cross-checked against field conditions
Drawings Reflect As-Built Conditions
Project documentation reviewed and updated to reflect installed conditions — clear and reliable records for all project stakeholders
Deficiencies Managed Through Closeout
Identified deficiencies documented, tracked, and coordinated through resolution to support a complete project handoff
Communication Networks Validated
M-Bus, pulse, gateway, and remote communication networks tested to confirm connected devices are responsive before handoff
How We Work

From Assessment to Sign-Off

A four-phase delivery model that gives developers and operators complete visibility at every stage.

1
Phase 01

Site Assessment & Walkthrough

Full building audit — electrical rooms, meter spaces, communication paths, water/BTU infrastructure — documented in a formal site report.

2
Phase 02

Engineering & Submittal Package

Single-line diagrams, riser drawings, metering layouts, and equipment submittals developed to support consultant review, contractor coordination, and project requirements.

3
Phase 03

Field Commissioning

System-level commissioning of electrical, water, and BTU metering systems — including meter configuration, communication testing, field verification, photo documentation, and live data validation.

4
Phase 04

Deficiency Resolution & Handoff

Identified deficiencies documented, tracked, and coordinated through resolution. Meter information and system operation verified against field conditions, with complete commissioning and as-built documentation prepared for project closeout.

Metering Systems

Systems We Commission

Technical expertise across electrical, water, thermal, and communication systems commonly used in Canadian submetering projects.

Electrical Submetering
Complete electrical meter commissioning — including meter configuration, CT verification, phasing checks, live reading validation, and communication network testing.
Multi-Circuit MeteringCT VerificationM-Bus
Water Metering
M-Bus wired, LoRa wireless, and cellular water commissioning — Wired Meter meter installation, scan file verification, multiplier config.
M-Bus Water MeteringWireless MeteringCellular Water MeteringWired Water Metering
BTU / Thermal Metering
BTU Metering BTU calculator commissioning — T1/T2 sensor orientation, flow meter direction, delta T verification, M-Bus addressing.
BTU MeteringThermal MeteringM-Bus
Communication Infrastructure
Cellular Gateways cellular router installation, Cat5 home-run cabling, network switch configuration, LTE signal verification.
Cellular GatewaysCat5LTE Cellular
Engineering Documentation
Complete technical documentation to support your project from design through closeout — including single-line diagrams, riser drawings, metering layouts, equipment schedules, and as-built documentation.
Single-Line DiagramsRiser DrawingsMetering LayoutsAs-Builts
Deficiency & QA
Structured deficiency logging, root cause analysis, field resolution and verification reporting — keeping projects on track.
Field VerificationBilling AuditQA Sign-Off
National Coverage

Operating
Across Canada

Wherever your project is located, VMS brings specialized submetering expertise directly to the field. We mobilize across Canada for site assessments, commissioning, system verification, and deficiency resolution — providing consistent technical support from project start through handoff.

30+
Concurrent projects managed
10+
Provinces served
3
Utility system specializations
0
Billing errors at handoff
Service Provinces
🍁OntarioPrimary
🏔British Columbia
🌾Alberta
❄Manitoba
🌊Quebec
🦞Nova Scotia
🌿Saskatchewan
🗺All ProvincesMobile
Get in Touch

Ready to Commission Your Building?

Send us your project details and we'll respond within 48 hours with a scope of work.

Location
Greater Toronto Area · National Operations
Website
vmsmetering.ca
Response Time
Within 48 business hours

Send Us a Message
vmsmetering.ca
Greater Toronto Area · National Operations